FOUNDATION PILES

We specialize in fast-curing, high-performance pre-stressed pre-cast concrete piles that satisfy the needs for strength and and time constraints of your project. Our concrete piles can achieve full 28-day strength in less one week, and can be design sulphur-resistant to withstand the corroding effects of salty air and water.

Visit Us

  • Phillip Goldson Highway Belize City, Belize, C.A.
  • info@maheias.com
  • 224-4436 / 223-5872
  • 223-3889